Which employee's path is the critical path on this activity graph? Explain how you know that this employee's path is the critical path.

Which Employee's Path Is The Critical Path On This Activity Graph? Explain How You Know That This Employee's

Answers

Answer 1

Answer:

Jim's path is the critical path on this activity graph.

Step-by-step explanation:

Critical Path:

Critical path is the the longest path in the project task paths. It shows the least amount of time in which project can be completed. It can be find by looking at the longest path in the network diagram of the project; not in term of nodes or activities instead in term of days.

In given case:

Path 1 Bill task's total duration= 6 days

Path 2 Jim's task's total duration= 17 days

Path 3 Betty task's total duration= 7 days

Path 4 Cynthia task's total duration= 14 days

Hence the longest path i.e. critical path is of Jim's activity path !


Related Questions

Please need help on this

Answers

Answer:

The first one is not a function

The second is a function

Third not a function

Fourth is a function

Step-by-step explanation:

Kim's softball team was playing in the championship game. When there were 4 innings left, the team was losing by a score of 17 to 6 points. In the last 4 innings, her team scored the same number of points per inning, and the other team did not score any more points. Kim's team won with the most points.
Write an inequality to determine the number of points per inning, ppp, Kim's team could have scored.

Answers

Answer:

The required inequality is [tex]6+4p>17[/tex].

Step-by-step explanation:

Let p represent the number of runs per inning.

It is given that the team scores the same number of runs per inning and the other team did not score any more points. So, the total score of other team after last four inning is 17.

Kim's team total score in last four inning is 4p. So, the total score of Kim's team after last four inning is

[tex]6+4p[/tex]

Kim's team win if the total score of other team after last four inning is less than the Kim's team.

[tex]6+4p>17[/tex]

Therefore the required inequality is [tex]6+4p>17[/tex].

Answer:

6+4p>17

Step-by-step explanation:

3 per inning

A squirrel runs across a road in 3 seconds. The road was more than 34 feet wide. Which inequality can be used to determine the squirrel’s speed?
3r is greater than 34
3r is less than 34
r/3 is greater than 34
r/3 is less than 34

What is the solution to the inequality? Round to the nearest tenth, if necessary.
r less than 11.3
r greater than 11.3
r less than 102
r greater than 102

How can you interpret the solution?
The squirrel can run at least 11.3
The squirrel can run faster than 11.3
The squirrel can run no faster than 102
The squirrel can run slower than 102

Answers

Answer:

Step-by-step explanation:

squirrel speed (r) x seconds (3)  has to be more than 34 feet

3r is greater than 34

r is greater than 11.3

34 / 3 = 11.333

11.3 (squirrels speed) x 3 (seconds) = 33.9 feet

the squirrel can run faster than 11.3

Answer:

A). Option A

B). Option B

C). Option B

Step-by-step explanation:

A). A squirrel runs across a road in 3 seconds.

Width of the road is more than 34 feet.

We have to calculate the squirrel speed.

Speed = [tex]\frac{\text{Distance}}{\text{Time}}[/tex]

           = [tex]\frac{34}{3}[/tex]

Since distance is more that 34 so the speed will be more than [tex]\frac{34}{3}[/tex]

This is because Speed ∝ Distance.

Let r is the speed of squirrel.

r > [tex]\frac{34}{3}[/tex]

3r > 34

Option A is the correct option.

B). Inequality is 3r > 34

r > [tex]\frac{34}{3}[/tex]

r > 11.3

Option B is the answer.

C). The squirrel can run at faster than 11.3 feet per second.

Option B.

6 = 2( x + 8) - 5 x​

Answers

Answer: The answer has 3 forms!

Decimal form: 3.3Exact form: 10/3Mixed Number form: 3 1/3

I hope that this helps! :D

ANSWER

[tex]x = 3. \bar3[/tex]

EXPLANATION

The given equation is

[tex]6 = 2(x + 8) - 5x[/tex]

We expand to get,

[tex]6 = 2x + 16 - 5x[/tex]

We combine similar terms,

[tex]5x - 2x = 16 - 6[/tex]

[tex]3x = 10[/tex]

[tex]x = \frac{10}{3} [/tex]

[tex]x = 3 \frac{1}{3} [/tex]

[tex]x = 3. \bar3[/tex]

A rectangular block measures 3 cm x 4 cm x 3 cm how much water would it displace?

Answers

Answer:

36c^3m^3x^2

Step-by-step explanation:

you first multiply 3 cm by 4 cm by 3 cm to get 36 cm.its mass in air and its effective mass when submerged in water (density = 1 gram per cubic centimeter).1.0 g/cm3then you get the answer 36c^3m^3x^2

whats is pemdas in math

Answers

P: Parentheses

E: Exponents

M: Multiplication

D: Division

A: Addition

S: Subtraction

What PEMDAS stands for is that in a mathematical equation, parentheses has the priority of being solved. The second priority goes to exponents, then Multiplication and Division, and then finally Addition and Subtraction.

[tex]\text{Hey there!}[/tex]

[tex]\text{The P stands for parentheses}[/tex]

[tex]\text{The E stands for exponents}[/tex]

[tex]\text{The M stands for multiplication/multiply}[/tex]

[tex]\text{The D stands for division/divide}[/tex]

[tex]\text{The A stands for Addition/Add}[/tex]

[tex]\text{The S stands for Subtraction/Subtract}[/tex]

[tex]\text{Some people refer to it as: (P)lease (E)xcuse (M)y (D)ear (A)unt (S)ally}[/tex]  [tex]\text{method for the abbreviations}[/tex]

[tex]\text{Good luck on your assignment and enjoy your day!}[/tex]

~[tex]\frak{LoveYourselfFirst:)}[/tex]

The perimeter of the following figure is 18.6 inches. What is the length of n?



13.8 in.
4.8 in.
5 in.
7.5 in.

Answers

For this case we have by definition, that the perimeter of the figure will be given by the sum of its sides, that is:

[tex]n + 3 + 6.3 + 4.5 = 18.6[/tex]

We add similar terms:

[tex]n + 13.8 = 18.6\\n = 18.6-13.8\\n = 4.8[/tex]

Thus, the correct option is option b. That is, [tex]4.8 \ in[/tex]

Answer:

[tex]4.8 \ in[/tex]

Answer: second option.

Step-by-step explanation:

The perimeter of the figure is the sum the lenghts of its sides.

You know that the perimeter of this figure is 18.6 inches.

You can observe that it has four sides and three lenghts are given.

Then, you can write this expression:

[tex]18.6in=3in+6.3in+4.5in+n[/tex]

Now you need to solve for "n" to calculate its value.

This is:

[tex]n=3in+6.3in+4.5in-18.6in[/tex]

[tex]n=18.6in-3in-6.3in-4.5in[/tex]

[tex]n=18.6in-13.8in[/tex]

[tex]n=4.8in[/tex]

Which equation is graphed here?

Answers

Answer:

The third one or the first one

Step-by-step explanation:

Can't be +4 or -4

Answer:

The equation of the line on the graph is y - 4 = -3(x+1)

What are the zeros of the function f(x) = x2 - 5x + 4?​

Answers

To find the zeros set the equation equal to zero:

x^2 - 5x +4 = 0

Factor:

(x-4) (x-1) = 0

Now solve each set of parenthesis so that they equal zero:

(x-4) = 0, x =4

(x-1) = 0, x = 1

The zeros are 1,4

Find the missing exponent. Explain 5^11/5^?=5^4

Answers

Answer:

The missing exponent is 5^7

Step-by-step explanation:

5^11/5^?=5^4

1. Subtract the exponents from each other.

11-4=7

2. Plug 7 in as the exponent.

5^11/5^7

3. 11-7=4 therefore, 5^11/5^7 equals 5^4.

Answer:

? = 7

Step-by-step explanation:

[tex]\text{We know:}\ \dfrac{a^n}{a^m}=a^{n-m}.\\\\\dfrac{5^{11}}{5^{?}}=5^4\\\\5^{11-?}=5^4\to?=7\ \text{because}\ 11-7=4[/tex]

PLEASE HURRY!! VW is parallel to YZ in the map below. Which proportion solves for the distance between Y and Z?

Answers

Answer:

[tex]\frac{3}{9}=\frac{4}{x}[/tex]

Step-by-step explanation:

we know that

If two figures are similar, then the ratio of its corresponding sides is proportional

In this problem

Triangle XVW is similar to triangle XZY

therefore

[tex]\frac{YZ}{VW}=\frac{XZ}{XV}[/tex]

substitute the given values

[tex]\frac{x}{4}=\frac{9}{3}[/tex]

[tex]x=3*4=12\ miles[/tex]

Answer:

A

Step-by-step explanation:

Write and solve a quadratic equation for the situation below. Choose the answer that has both an equation that correctly models the situation as well as the correct solution for the situation. An isosceles right triangle has sides that are x + 2 units long and a hypotenuse that is 8 units long. What is the length of the missing sides of the triangle?

Answers

Answer:

2(x^2 + 4x - 28) = 0.

The length of the missing sides are:

4√2 units.

or 5.66 units ( to the nearest hundredth).

Step-by-step explanation:

Applying the Pythagoras Theorem:

8^2 = (x + 2)^2 + (x + 2)^2

2(x^2 + 4x + 4) = 64

2x^2 + 8x + 8 - 64 = 0

2x^2 + 8x - 56 = 0

2(x^2 + 4x - 28) = 0  models the situation.

Solving:

x = [- 4 +/- √(4^2-4*1*-28)]  / 2

= (-4 +/- √128) / 2

= (-4 + 8√2) / 2 ,   (-4 - 8√2) / 2  (we ignore this negative root).

= -2 + 4√2.

This is 3.66 to the nearest hundredth.

So the  length of the 2 equal sides is 2 + (- 2 + 4√2) = 4√2.

or  5.66 to the nearest hundredth.

Jon drove 365 on 20 gallons of gas. How many miles did he get per gallon?

Answers

Answer:

18.25

Step-by-step explanation:

365 ÷ 20 = 18.25

Final answer:

Jon drove 365 miles on 20 gallons of gas, so to find out how many miles he got per gallon, you divide 365 miles by 20 gallons. The result is 18.25 miles per gallon.

Explanation:

To solve this problem, you need to divide the total number of miles that Jon drove by the number of gallons of gas he used. This is because the miles per gallon is calculated by dividing the total miles driven by the amount of gas used.

So, in this case, you would do the following calculation: 365 miles ÷ 20 gallons = 18.25 miles per gallon

This means that Jon got 18.25 miles per gallon of gas.

Learn more about miles per gallon here:

https://brainly.com/question/35584121

#SPJ11

Please answer.

The table represents the function f(x) = 2x+1

Which value goes in the empty cell?

A)3
B)5
C)8
D)23

Answers

Replace the x in the equation with the x value in tha table for the missing f(x) and calculate:

f(x) = 2x +1 = 2(2) +1 = 4 +1 = 5

The answer is B) 5

The table represents the function f(x) = 2x +1. The value goes in the empty cell is 5. The answer is B) 5.

What is a function?

A function is a type of relation, or rule, that maps one input to specific single output.

The table represents the function

f(x) = 2x +1

Replace the x in the equation with the x value in the table for the missing f(x)

F( 2) = 2(2) +1

F( 2) = 4 +1

F( 2) = 5

The answer is B) 5

Learn more about function here:

https://brainly.com/question/2253924

#SPJ2

on Saturday morning Owen earned $29. By the end of the afternoon he had earned a total of $67. Enter an equation, using x as your variable to determine whether Owen earned $38 or $34 on Saturday afternoon

Answers

Answer:

$67 = $29 + $ x

Step-by-step explanation:

Given that on Saturday morning Owen earned= $29

End of afternoon amount total earned was= $67

Let's find the amount earned in the afternoon=?

Let's take the amount earned in the afternoon to be =$ x

Equation for total amount earned by the end of afternoon= $29 + $x

But we know total amount earned by end of afternoon was=$67 hence

the equation to determine afternoon amount will be;

$67 = $29 + $ x ----------------------------go ahead and solve for x

$67-$29 = $ x

$ 38 = x

The two right scalene triangles shown are similar , but not congruent. Which statement about the triangles is not true

Answers

Answer:

Third choice.

The right correspondence is [tex]\angle CDB \cong \angle ECD[/tex]

Step-by-step explanation:

The third choice is not true, that is

[tex]\angle CDB[/tex] NOT corresponds to [tex]\angle ECD[/tex]

If [tex]\triangle CBD \sim \triangle CDE[/tex], then corresponding sides are proportional, and corresponding angles are congruent. The corresponding angle of [tex]\angle CDB[/tex] is

[tex]\angle CDB \cong \angle ECD[/tex]

Therefore, the third option shows a wrong correspondence, that's the right choice in this case, because it doesn't express a valid correspondence.

36+4x=x^2+15
What is x?

Answers

X = -3 or X = 7

Step 1: Simplify both sides of the equation.

Step 2: Subtract x^2+15 from both sides.

Step 3: Factor left side of equation.

Step 4: Set factors equal to 0.

Answer:

x=7 or x=-3

Step-by-step explanation:

36+4x=x^2+15

36-15+4x=x^2

21+4x=x^2

0=x^2-4x-21

0=x^2-(7-3)x-21

0= x^2-7x+3x-21

0= x(x-7)+3(x-7)

0= (x-7)(x+3)

so either

x-7=0

x=7

or x+3=0

x=-3

Find the equation of the circle that has diameter endpoints of ( 4, 8 ) and (10, 16 )

Answers

Answer:

[tex](x-7)^2+(y-4)^2=25[/tex]

Step-by-step explanation:

The circle has diameter endpoints of ( 4, 8 ) and (10, 16 ).

The midpoint of the diameter is the center

[tex](\frac{4+10}{2},\frac{8+16}{2})[/tex]

[tex](\frac{14}{2},\frac{24}{2})[/tex]

[tex](7,12)[/tex]

The radius is the distance from the center to any point on the circumference.

[tex]r=\sqrt{(7-4)^2+(12-8)^2}[/tex]

[tex]r=\sqrt{(3)^2+(4)^2}[/tex]

[tex]r=\sqrt{9+16}[/tex]

[tex]r=\sqrt{25}=5[/tex]

The equation of the circle with center (h,k) and radius r is given by:

[tex](x-h)^2+(y-k)^2=r^2[/tex]

We plug in the values to get:

[tex](x-7)^2+(y-4)^2=5^2[/tex]

[tex](x-7)^2+(y-4)^2=25[/tex]

Answer:

The equation of the circle is (x - 7)² + (y - 12)² = 25

Step-by-step explanation:

* Lets revise the equation of the circle

- The equation of the circle which has center (h , k) is:

 (x - h)² + (y - k)² = r²

- The endpoints of a diameter re (4 , 8) and (10 , 16)

- The center of the circle is the mid-point of the diameter

* Lets revise the rule of the mid point to get the center of the circle

 and revise the rule of the distance to get the length of the diameter

- The mid point (x , y) of segment has endpoints (x1 , y1) and (x2 , y2) is

 x = (x1 + x2)/2  and y = (y1 + y2)/2

- The distance between the two point (x1 , y1) and (x2 , y2) is:

  d = √[(x2 - x1)² + (y2 - y1)²]

* Now lets find the center of the circle

∵ (h , k) is the mid-point of the diameter

∵ (4 , 8) is (x1 , y1) and (10 , 16) is (x2 , y2)

∴ h = (4 + 10)/2 = 14/2 = 7

∴ k = (8 + 16)/2 = 24/2 = 12

∴ The center of the circle is (7 , 12)

∵ The length of the diameter = √[(10 - 4)² + (16 - 8)²

∴ d = √[6² + 8²] = √[36 + 64] = √100 = 10

∵ The radius = 1/2 the diameter

∴ r = 1/2 (10) = 5

* Lets write the equation of the circle

∵ The equation of the circle is (x - h)² + (y - k)² = r²

∵ h = 7 , k = 12 , r = 5

∴ The equation of the circle is (x - 7)² + (y - 12)² = 5²

∴ The equation of the circle is (x - 7)² + (y - 12)² = 25

Sal wants to build a robot. He puts a sphere on top of a cylinder.what will probably happen?

Answers

Answer:

It depends on which side of the cylinder. If she puts it on the curved side, it will roll off. If she puts it on the flat side and stabalizes it, it will stay in place if no further force is acted on it.

Please answer right away

Answers

Answer:

$29000 with a margin of error of $5000

Step-by-step explanation:

We have that the midpoint between the given values ​​is

(X1+X2) / 2 = ($34000+$24000)/2 = $29000

We have that the midpoint between the given values ​​would be

(X2-X1)/2=($34000-$24000)/2=$10000/2=$5000

So I can write that approach as $29000 with a margin of error of $5000

Done

what is the range of the function on the graph

Answers

Answer:

All real numbers greater than or equal to -2.

Step-by-step explanation:

The range is the set of values of the y-coordinates of the points on the graph.

The smallest y-coordinate is -2. All real numbers greater than equal to -2 are the range.

Answer: All real numbers greater than or equal to -2.

Given f(x) = e^x and g(x) = x – 2, what is the range of (g*f)(x)

Answers

Final Answer:

The range of (g * f)(x) is all real numbers (ℝ).

Explanation:

Composing functions: We first need to understand that (g * f)(x) refers to the composition of g and f, where f is evaluated first and then its output is used as the input for g. So, (g * f)(x) = g(f(x)) = g(e^x).

Analyzing g(e^x): The function g(x) simply subtracts 2 from its input. Since e^x is a real number for all real values of x, g(e^x) will also be a real number for all real values of x.

Range of the composed function: Therefore, as g(e^x) can take any real value, the range of (g * f)(x) will be all possible outputs of g(e^x), which is all real numbers (ℝ).

In simpler terms, no matter what real number you input into f(x), the final output after applying g(x) will always be a real number. This is because the subtraction in g(x) doesn't restrict the output in any way.

A circle has a radius of 5ft and an arc of length 7 ft is made by the intersection of the circle with a central angle. Which equation gives the measures of the central angle q?

Answers

Answer:

[tex]\frac{q}{360}[/tex] × π10 = 7

Explanation:

The formula to find arc length is [tex]\frac{x}{360}[/tex] × [tex]\pi r^{2}[/tex]

Simply plug in radius and arc length to get your equation.

Answer:

Central angle = 80.21°

Step-by-step explanation:

The arc length in circle is the product of radius and central angle made by the arc in radians.

That is

              l = rθ

Here given the values r = 5 ft and l = 7 ft

Substituting

             7 = 5 x θ

             θ = 1.4 radians

             [tex]\theta =1.4\times \frac{180}{\pi }=80.21^0[/tex]

Central angle = 80.21°

Sam worked 26 hours so far this week. He normally works a 40 hour week What fraction and percent represents the portion of hours he has worked? Simplify the fraction

Answers

Answer:

13/20, 65%

Step-by-step explanation:

So he has worked 26 hours out of 40 so that becomes 26/40 that is equal to 13/20 so that is your fraction and to convert to a percentage times 100 go that equals 65 so 65%

an outcome or set of outcomes of an experiment or situation​

Answers

Answer: Probability theory would be my best guess, but I would need more information to be able to fully answer this question.

Step-by-step explanation:

What is the midpoint between (-2, -3) and (1, 0.5)

Answers

Answer:

(-1/2,-1.25)

Step-by-step explanation:

Once you plot the points, you should be able to find the midpoint formula.

The midpoint between the points (-2, -3) and (1, 0.5) is (-0.5, -1.25).

To find the midpoint between two points, you average the x-values and the y-values of the given points separately. The formula for the midpoint M between two points P1(x1, y1) and P2(x2, y2) is

M = ((x1 + x2) / 2, (y1 + y2) / 2)

Applying this to the given points (-2, -3) and (1, 0.5), we calculate the midpoint as follows:

Average the x-values:

(-2 + 1) / 2 = -0.5

Average the y-values:

(-3 + 0.5) / 2 = -1.25

What the equation of the quadratic function in standard form represented by the graph

Answers

Answer:

x^2 +6x +8

Step-by-step explanation:

The zeros of the graphed function appear to be (-4, 0) and (-2, 0). It appears the vertex is (-3, -1).

The standard form of the function with zeros p and q is ...

(x -p)(x -q) = x^2 -(p+q)x +pq

So, for zeros p=-4, q=-2, the standard form is ...

x^2 -(-4-2)x +(-4)(-2) = x^2 +6x +8

We can check to make sure the above vertex point satisfies this function:

(-3)^2 +6(-3) +8 = 9 -18 +8 = -1

The vertex satisfies the function we wrote, so there are no additional vertical scale factors required.

The function is ...

y = x^2 +6x +8

A dilation produces a smaller figure. Which is a possible scale factor?

Answers

Final answer:

A dilation producing a smaller figure requires a scale factor less than 1. If the scale factor is 1/2, the model size is half the actual size. By setting up and solving a proportion, actual dimensions can be calculated.

Explanation:

When a dilation results in a smaller figure, the scale factor used is less than 1. Think of the scale factor as a fraction where the actual size is the denominator and the model size is the numerator. For instance, a scale factor of 1/2 would mean that the model is half the size of the actual figure.

For a practical example: if we have a scale factor of 1:4 and the scale measurement is 4, the actual dimension can be found by setting up a proportion as 1/4=4/x, solving for x would give us the actual dimension, which in this case would be 16.

If a 4 ft stick cast a shadow of 2.8 ft. What is the height of a tree that cast a shadow of 27.44 ft?​

Answers

Answer:

Height of tree = 39.2 ft

Step-by-step explanation:

The relationship between the height of an object and the length of it's shadow is directly proportional.

So:

[tex]\frac{4}{2.8} =\frac{h}{27.44}[/tex]

h = Height of tree in feet

Cross multiply

2.8h = 4 · 27.44

Simplify

2.8h = 109.76

÷2.8 both sides

h = 39.2

Height of tree = 39.2 ft

The height  of a tree that cast a shadow of 27.44 ft is 39.2 ft

What is Ratio?

A ratio is an ordered pair of numbers a and b, written a / b where b does not equal 0.

Given that  a 4 ft stick cast a shadow of 2.8 ft.

We have to find the height of a tree that cast a shadow of 27.44 ft

Let us consider x as the  height of a tree that cast a shadow of 27.44 ft.

Let us form a proportional equation

4/2.8=x/27.44

Apply cross multiplication.

4×27.44=2.8x

109.76=2.8x

Divide both sides by 2.8

x=109.76/2.8

x=39.2

Hence, the height  of a tree that cast a shadow of 27.44 ft is 39.2 ft.

To learn more on Ratios click:

https://brainly.com/question/13419413

#SPJ2

will mark brainliest!!

Solve the system of equations. x2 = y + x + 8
y = -x + 2

A) ( radical 10 , 2 - radical 10 ) and ( radical 10 , 2 + radical 10 )
B) ( radical 10 , 2 - radical 10 ) and (- radical 10 , 2 - radical 10 )
C) ( radical 10 , 2 - radical 10 ) and (- radical 10 , 2 + radical 10 )
D) ( radical 10 , -2 - radical 10 ) and (- radical 10 , 2 + radical 10 )

Answers

Answer:

the answer is A) ( radical 10 , 2 - radical 10 ) and ( radical 10 , 2 + radical 10 )

Step-by-step explanation:

Other Questions
Jackie bought 2/ packages of papers for $5.80 each and 4 notebooks for d dollars each she spent $32 for the packages of paper and the notebooks Write and equation using D that represents the situation above How much heat is absorbed by a 70g iron skillet when its temperature rises from 13oC to 28oC? Jon is running for city council and wants to campaign on human development goals for his community. Which issue should he use? A. better roads B. less traffic C. lower taxes D. higher taxes E. better schools Inverse of the function Y = 3x^5 -4 After hearing the this list of words, night, snore, tired, bed, pillow, yawn, dark, toss, turn, blanket, subjects were asked to write down the words they heard. they frequently included the word sleep. this illustrates lf f(x) = 5x, what is f^-1(x)? Which represents the solution(s) of the system of equations, y = x2 6x + 8 and y = x + 4? Determine the solution set by graphing. Botswana announced this week that it is lifting its ban on the hunting of what animal? What is the approximate volume of the cone? use 3.14 for QUESTION 7Which of the following gives an example of a set that is closed under multiplication? Choose all that apply.The product of an even number and an oven numberThe product of an odd number and an odd numberThe product of a negative number and a negative number|The product of a perfect cube and a perfect cube Given six memory partitions of 300 kb, 600 kb, 350 kb, 200 kb, 750 kb, and 125 kb (in order, how would the first-fit, best-fit, and worst-fit algorithms place processes of size 115 kb, 500 kb, 358 kb, 200 kb, and 375 kb (in order? If g(x)=f(x)-1, then g(x) translates the function f(x) 1 unit _[blank]_. What are the solution(s) to the quadratic equation 50 x2 = 0?x = 2x = 6x = 5no real solution A student designs an ammeter (a device that measures electrical current) that is based on the electrolysis of water into hydrogen and oxygen gases. When electrical current of unknown magnitude is run through the device for 2.00 min , 12.4 mL of water-saturated H2(g) is collected. The temperature and pressure of the system are 25 C and 715 torr. Part A How many moles of hydrogen gas are produced? Express your answer to three significant figures and include the appropriate units. In ancient Greece, the Olympics were composed of fewer events compared to the modern games. True False Which of the following uses active voice? A - Alison gave the doctor all their medical records. B - The last cookie was eaten by my baby sister. C - The volleyball game can be observed from the pier. D - The votes were collected by the volunteers. Consider this plant cell.Which organelle is labeled A Birds that do not receive adequate nutrition during development sing less often and for shorter periods of time as adult birds. Which BEST describes the outcome of nutritional stress in these songbirds?They are less likely to obtain good nesting sites.They are less likely to attract mates and pass on their genes.They are less likely to find adequate food supplies.They are less likely to ward off predators. What is : x=29-3(9-4)Please show work Determine which answer choice matches the dot plot you drew? Steam Workshop Downloader